5 step repair method
- The technician drills holes along the foundation crack
- The cracks and holes are cleaned ensuring all debris and dust is cleaned
- An epoxy cement is applied to the surface of the crack
- Metal injection ports are inserted in the holes made by the technician
Water and polyurethane are injected under high pressure. The polyurethane expands and fills the crack.